BSDG TeamApr 7, 20201 min readFateThe structure of the main floor is completed and getting inspected before the pour of second floor that will contain the one-bedroom and...
BSDG TeamApr 7, 20201 min readFate Mix-UseFoundation is poured and the structure is starting to go up. The main floor of this building has retail space available for lease, along...